"Artist rendering" of the proposed trail design at the Maple Street entrance.  If drainage issues are addressed by the City, Jim Schneider has agreed to construct an access road in this area that will span approximately 1300 feet from Maple Street back to the 51 acre tile mill site.  Bicycle lanes will be painted on each side of the road as illustrated.  The City of London has long range plans to develop the 51 acre tile mill land into a nature preserve.